Brampton Cycling Club Forum

Club Matters => Road Advisory => Topic started by: AndyL on June 22, 2020, 11:17:29 AM

Title: Sideroad 50 Erin till Sept 4
Post by: AndyL on June 22, 2020, 11:17:29 AM
This closure is the section where Sideroad 5 crosses Trafalgar (24) and turns into Sideroad 50.
Therefore take 9th Line up into Erin or down to Ballinafad Sideroad (32).

Please be advised Wellington Road 50 from Fifth Line to Wellington Road 24, in the Town of Erin is closed for road reconstruction including culvert repairs as of 8:30 am on Monday, June 22, 2020.

There will be no through access during this closure.  A detour route is posted at the construction site, as well as on the County of Wellington website www.wellington.ca, taking the travelling public around the project site.  The detour will utilize Wellington Roads 125, 124, and 24.

Duration: June 22 to September 4, 2020