• Welcome to Brampton Cycling Club Forum.
 
avatar_Thomas Bruck

15 Sideroad and 2nd Line near Moffat

Started by Thomas Bruck, July 22, 2022, 07:54:04 PM

Previous topic - Next topic

Thomas Bruck

Resurfacing 15 Sideroad West of Guelph Line and 2nd Line. Controlled traffic and scraped rough road.
2nd Line south of 15 Sideroad is open for local traffic only. Take 1st Line for the time being.
New surface on entire 2nd like looks good so far. Hope they won't chip it now.
Thomas

JasonGRoth

I can confirm, that section of 15 Side Road is a mess!  :-\